ZYANYA — New Launch Profile

New Launch Profile Last reviewed

ZYANYA sits in District 14 (Geylang / Eunos) and is positioned in the RCR segment of the Singapore private residential market. With TBD units on a undisclosed tenure title and an expected Temporary Occupation Permit (TOP) of TBD, the development is among the new-launch cohort buyers should evaluate against alternative new-builds and resale comparables in the surrounding area. Pricing for new launches typically commands a 10–25% PSF premium over comparable resale, reflecting new-build condition, developer warranty, modern unit layouts, and the staged-payment cash-flow advantage of Progressive Payment Schemes (PPS).

For buyers, the new-launch decision turns on (a) launch-tranche pricing relative to the project’s long-run trajectory, (b) the developer’s track record on construction quality and TOP timing, (c) the surrounding-area supply pipeline (will more launches dilute pricing?), and (d) the macro rate environment between OTP and TOP — SORA can move materially in that 3–4 year window. Cross-reference District 14 (Geylang / Eunos) pricing and use the ShiokNest price heatmap for segment-level PSF context.

The Singapore new-launch market operates under cooling-measure architecture set in April 2023: foreign-buyer Additional Buyer’s Stamp Duty at 60%, Singapore Citizen second-property ABSD at 20%, and a 55% Total Debt Servicing Ratio (TDSR) ceiling per the MAS TDSR/MSR framework. Stamp duty for ZYANYA is the dominant upfront cost variable: progressive Buyer’s Stamp Duty per the IRAS BSD rate table plus any applicable ABSD per the IRAS ABSD rate table. Use the BSD/ABSD stamp duty calculator to size your specific upfront cost.

Developer is NNB 8 Development Pte Ltd. The track record of the developer — on past project TOP timing, defect-rectification responsiveness during the Defects Liability Period (DLP), and resale appreciation history of completed projects — is one of the most under-weighted variables in new-launch decisions. Buyers should request a developer track record document and cross-reference past projects via URA REALIS transaction history.

The financing context: SORA-pegged floating-rate mortgages currently price near 4.00% all-in (3.25% 3M SORA + 0.75% bank spread). Under the PPS, buyers draw the mortgage progressively as construction milestones complete, paying interest only on disbursed amounts until TOP. CPF Ordinary Account usage applies per the CPF housing usage rules, subject to the Valuation Limit and Withdrawal Limit. The URA Master Plan 2019 provides forward zoning context for surrounding plots — relevant for understanding whether the area’s built-form will intensify or remain stable over your holding period.

For: First-time buyersHDB upgraders
Source: URA REALIS
Key Takeaways
  • Project: ZYANYA in District 14 (Rest of Central Region)
  • Developer: NNB 8 Development Pte Ltd
  • Total units: 34
  • Sales: 34 sold of 34 launched (100% absorption)
  • Average median PSF: $1,931 psf

Project Overview

ZYANYA is a private residential development in District 14 (Rest of Central Region), developed by NNB 8 Development Pte Ltd. The project comprises 34 units.

Location Map

Project location with up to 5 of the nearest comparable condos in District 14.

  • ZYANYA
  • CENTRA SUITES
  • SKT MANSIONS
  • ENG APARTMENTS
  • EAST 25 APARTMENTS
  • EXCELLENCE MANSIONS

Loading chart data...

Sales Performance

ZYANYA has sold 34 out of 34 launched units, achieving an absorption rate of 100%.

Monthly sales for ZYANYA
PeriodSoldLaunchedCumul. SoldCumul. LaunchedAvailable
Feb 202310223412
Mar 202300223412
Apr 202300223412
May 20233025349
Jun 20230025349
Jul 20230025349
Aug 20231025349
Sep 20231026348
Oct 20230026348
Nov 20230026348
Dec 20230026348
Jan 20240026348
Feb 20240026348
Mar 20240026348
Apr 20240026348
May 20240026348
Jun 20240026348
Jul 20240026348
Aug 20240026348
Sep 20240026348
Oct 20240028346
Nov 20240028346
Dec 20240028346
Jan 20251030344
Feb 20250030344
Mar 20250030344
Apr 20250030344
May 20250030344
Jun 20250030344
Jul 20250030344
Aug 20250030344
Sep 20250030344
Oct 20250030344
Nov 20251033341
Dec 20250033341
Jan 20260034340

Price Analysis

Price analysis for ZYANYA based on monthly developer sales data.

Monthly prices for ZYANYA
PeriodMedian PSFHighest PSFLowest PSF
Feb 2023$1,790 psf$1,790 psf$1,790 psf
May 2023$1,891 psf$1,926 psf$1,876 psf
Aug 2023$1,895 psf$1,895 psf$1,895 psf
Sep 2023$1,876 psf$1,876 psf$1,876 psf
Jan 2025$2,015 psf$2,015 psf$2,015 psf
Nov 2025$2,117 psf$2,117 psf$2,117 psf
Project Snapshot
ZYANYA by NNB 8 Development Pte Ltd — 100% absorption rate with an average median PSF of $1,931 psf in District 14 (Rest of Central Region).
🧮Estimate Your Monthly Payments

Sales Velocity

Monthly units sold trend for ZYANYA.

Sales velocity for ZYANYA
PeriodUnits Sold
Feb 20231
May 20233
Aug 20231
Sep 20231
Jan 20251
Nov 20251

Developer Background

NNB 8 Development Pte Ltd is the developer of ZYANYA.

New-build advantages. ZYANYA offers modern unit layouts, contemporary facilities, full developer warranty, and the latest construction quality standards. For owner-occupiers, this translates to immediate move-in readiness without the renovation lift that resale typically requires. For investors, new-build status supports higher rental tenant preference and lower initial maintenance.

RCR positioning. The RCR segment in District 14 occupies a defined buyer cohort. RCR (Rest of Central Region) is the city-fringe segment — quality residential with reasonable CBD access at lower PSF than CCR. RCR demand is increasingly upgrader-driven as HDB owners seek private property in well-connected fringes. Use the district comparison calculator for cross-segment benchmarking.

Progressive Payment cash-flow. Under PPS, buyers pay in stages aligned with construction milestones (Foundation 10%, RC Framework 10%, Walls 5%, Roofing 5%, etc.), which spreads the cash outlay across the 3–4 year build window. This is materially different from resale where the full price clears within weeks of OTP. For yield-focused investors, the staged interest accrual on disbursed amounts only is a real cost advantage during construction. Model the cash-flow timeline via the cash flow calculator.

TOP timing risk. TBD is the expected TOP year but actual completion can slip 6–18 months on materials shortages, labour disputes, or developer cash-flow issues. Buyers committed to a TOP-aligned life event (relocation, child schooling, mortgage refinancing window) should factor a buffer. Developer track record on prior TOP timing is the best predictor; verify via past project history.

Rate-cycle risk. The 3–4 year PPS window between OTP and TOP exposes the buyer to SORA shifts. A buyer signing OTP at current 3.25% SORA could face TOP-year rates 100–200bp different in either direction. Stress-test affordability at SORA +75bp via the TDSR / MSR affordability calculator to confirm headroom under adverse rate scenarios.

Supply pipeline risk. Future GLS tranches near the project could introduce competing new launches that dilute pricing power. Check the URA GLS schedule for sites within a 1km radius of ZYANYA; concentrated new-supply in a fringe district can cap price appreciation during the holding period.

Resale exit risk. New launches typically command a premium over resale; on exit, the buyer becomes the resale seller competing against newer launches in the same area. Holding through and beyond the 3-year Seller’s Stamp Duty (SSD) window is structural for most buyers; shorter holds risk both SSD and weak resale clearing.

[
    {
        "persona": "Singapore Citizen first-time buyer",
        "fit_color": "amber",
        "reason": "You pay 0% ABSD. RCR may stretch TDSR for median-income first-timers."
    },
    {
        "persona": "SC upgrader (sell HDB / decouple)",
        "fit_color": "green",
        "reason": "The 6-month ABSD remission window applies if this is your second residential property. Coordinate the existing-property sale carefully."
    },
    {
        "persona": "SC investor (second SC property)",
        "fit_color": "amber",
        "reason": "At 20% ABSD plus 4% all-in mortgage rate, leveraged yield maths is hostile. OCR yields are slightly better but still negative-carry typical."
    },
    {
        "persona": "Permanent Resident",
        "fit_color": "amber",
        "reason": "PR pays 5% ABSD on first property. OCR/RCR is more accessible for PR upgraders."
    },
    {
        "persona": "Foreign buyer (non-FTA national)",
        "fit_color": "red",
        "reason": "At 60% ABSD, the entry-cost premium versus an SC buyer is approximately $600K+ on a S$1.0M unit. Long-horizon owner-occupier motivation only."
    },
    {
        "persona": "FTA national (US / Swiss / Liechtenstein / Norway / Iceland)",
        "fit_color": "green",
        "reason": "You qualify for SC-equivalent ABSD (0% / 20% / 30% by property number). Verify treaty eligibility with conveyancing lawyer before OTP."
    }
]

Verdict for ZYANYA. The project sits in a known new-launch segment with documented buyer-type fit and policy environment. The honest assessment depends on (a) launch-tranche pricing relative to comparable resale in District 14, (b) the NNB 8 Development Pte Ltd developer track record, and (c) the buyer’s holding-horizon tolerance for the 3–4 year TOP window. For SC first-time buyers in OCR new launches, the 0% ABSD plus PPS cash-flow advantage make new-launch the often-rational choice. For SC second-property investors, the 20% ABSD plus negative-carry maths typically argues for resale value-buying instead. For foreign buyers, only owner-occupier residential motivation justifies the 60% ABSD entry. Suggested holding period: 7–10 years to amortise stamp duty and capture meaningful capital appreciation. Run total acquisition cost via the total acquisition cost calculator before committing.

Frequently Asked Questions

How many units does ZYANYA have?
ZYANYA has a total of 34 units.
What is the absorption rate for ZYANYA?
ZYANYA has an absorption rate of 100%, with 34 units sold out of 34 launched.
What is the average PSF for ZYANYA?
The average median PSF for ZYANYA is $1,931 psf.
What is the expected TOP for ZYANYA?

Expected TOP is TBD. Actual completion typically tracks the developer’s timeline within +6 months; verify current construction progress via developer sales material or URA REALIS. (as of 2026-05)

What ABSD applies to ZYANYA for a Singapore Citizen second-property purchase?

20% ABSD applies to a SC second residential property purchase, per the unchanged April-2023 cooling-measure schedule. On a S$2M purchase, that is S$400,000 upfront ABSD in addition to BSD of approximately S$69,600. Use the BSD/ABSD stamp duty calculator for exact figures (as of 2026-05).

Is ZYANYA freehold or leasehold?

The tenure is recorded as undisclosed tenure. Verify via the developer’s sales material and your conveyancing lawyer; the tenure type affects long-run resale value via lease-decay dynamics on 99-year leasehold stock.

How does PPS interest accrual work for ZYANYA?

Under Progressive Payment Scheme, you draw the mortgage in stages aligned with construction milestones. Interest accrues only on the disbursed amount, not the full purchase price, until TOP. Use the mortgage calculator at the current 4.00% effective rate to model staged disbursement.

What CPF can I use for ZYANYA?

CPF Ordinary Account funds apply to private property purchases subject to Valuation Limit (VL) and Withdrawal Limit (WL) rules. See CPF housing usage rules. The accrued-interest mechanics apply on eventual sale: principal withdrawn plus 2.5% per annum must be returned to CPF, reducing net sale proceeds.

Methodology & Sources

The dataset behind this report spans All available months; we refresh it as new data becomes available.

Transaction data sourced from URA REALIS.

  • Developer sales data from URA REALIS.
  • Median PSF, highest and lowest PSF from URA developer sales records.

Price-per-square-foot (PSF) here means the median deal in the period; means are reserved for volume-weighted aggregates explicitly labelled as such.